top of page

A new four-star hotel is planned for central Torrevieja as demolition begins on the Paseo de la Libertad

5 minutes ago
3 min read

Masa Rental plans to invest around €10 million in a 79-room hotel, which will be operated by Eurostars. The new property will add to the city’s hotel sector, whose accommodation capacity remains significantly smaller than that of the tourist-apartment market.


Demolition has begun on two old buildings on Paseo de la Libertad in central Torrevieja, making way for a planned four-star Superior hotel. The project by Masa Rental SOCIMI предусматривает 79 rooms and an investment of around €10 million. The future hotel will be operated by Eurostars, part of the Hotusa Group. The operator and the property owner have signed a lease agreement.


The new hotel will be located opposite the Paseo del Mar leisure area, close to the port and the town’s seafront promenade. Its main façade will face Paseo de la Libertad, while the rear of the building will have an exit onto Calle Diego Hernández. The plot covers approximately 500 square metres.


From historic hotels to a new tourist property

Two buildings dating from the 1960s previously stood on this site. Over the years, they housed the El Mar y Sal hotel and Hostal Valero. According to Torrevieja’s official chronicler, Francisco Sala, the latter continued to receive guests until the early 1980s.

The town council granted the demolition permit in January 2026. However, the works had to be coordinated with the redevelopment of Paseo de la Libertad and the surrounding area of the former fairground.


Before demolition, materials containing asbestos were removed from the buildings. This is a mandatory safety measure for such work: Spanish legislation requires hazardous materials to be removed under a specific procedure, involving appropriately qualified organisations and complying with worker and environmental protection rules. The discovery of asbestos in old buildings does not, in itself, mean that the surrounding area was contaminated or that regulations were breached.


A separate construction approval is still required

The start of demolition does not mean that construction of the hotel has already been authorised. To implement the project with the proposed parameters, a Plan de Reforma Interior (PRI), or Internal Reform Plan, is required. This planning instrument must align the site's urban-planning conditions with its intended hotel use.

According to information published on 19 November, preliminary documentation had already been registered, but the plan had not yet been put out for public consultation. As a result, the final construction timetable remains unknown.


How much hotel accommodation does Torrevieja currently offer?

The project is particularly interesting in the context of the local tourism market. According to Torrevieja’s Tourism Development Strategy 2025–2029, the city has 13 hotels with a combined capacity of approximately 1,778 beds.

The same document lists three hostels and one guesthouse, providing approximately 127 additional places. This means that the traditional hotel sector offers around 1,900 accommodation places in total when these categories are included alongside hotels.

The tourist-apartment market is considerably larger. According to Spain’s National Statistics Institute (INE), in May 2026 there were 3,887 tourist apartments and houses listed on major online platforms in Torrevieja. This figure reflects online-platform listings after duplicate entries had been removed.


What does this mean for the city?

A new four-star hotel will not, on its own, change the structure of Torrevieja’s tourism market: the supply of tourist apartments will remain considerably larger than the hotel sector. However, the project will add a higher-category hotel to the central coastal area.

For Torrevieja, this is an opportunity to expand accommodation choices, attract visitors who prefer traditional hotels and support restaurants, shops and other businesses in the town centre.

If the project completes all the necessary planning procedures, a new hotel aimed at the modern tourism market will replace two buildings whose hotel history dates back to the 1960s.


Sources:

  • Ayuntamiento de Torrevieja — demolition permit for buildings at Paseo de la Libertad, 4 and 5, 23 January 2026.

  • Periódico de Torrevieja, citing Información — project details and start of demolition, 19 November 2026.

  • Masa Rental SOCIMI — project and financial documentation on BME Scaleup.

  • Ayuntamiento de Torrevieja — Tourism Development Strategy 2025–2029.

  • INE — tourist-apartment statistics, May 2026.


Language availability: this article is also available in Spanish and Russian on TorreviejaActual.com.


------------------------------------------------------

KeyHold Online — property care in Spain

Leaving Spain for a few weeks or several months? Your property should not be left unattended.

KeyHold Online provides regular property checks for apartments and houses in Torrevieja, Orihuela Costa and the surrounding area.

Property condition checks, monitoring for possible leaks and faults, arranging cleaning and preparing your home for your return.

Your home is looked after, even when you are away.

More information: https://www.keyhold.online

 
 
 

Comments

Rated 0 out of 5 stars.
No ratings yet

Add a rating
bottom of page